14 May 2015
May 14, 2015

Highfield Lodge Update

0 Comment

Construction of the new Lodge is well underway. This photo was taken in April. Concrete is being poured into the ground floor level which includes the indoor pool. Residents are enjoying the rapid progress!

IMG_0202

This photo was taken on the 15th of May. It is great to see the framework go up for the main entrance to the Lodge.